East Midlands Airport

EMA Flying High With HSG

East Midlands Airport has further improved its environmental credentials by adopting an innovative water conservation system at the Castle Donington passenger terminal.

The challenge

East Midlands Airport, part of MAG (the group that own Manchester, London Stansted and East Midlands airports), was the first of any UK airport to make a commitment to achieve carbon neutral ground operations by 2012 – relating to buildings, ground support vehicles and service partner emissions.

In 2011/12, carbon emissions at the airport were reduced by a further 3,578 tonnes through energy reduction and the introduction of renewable energy, such as, the installation of two commercial scale wind turbines and the planting of a 26 hectare willow farm on site.

Keen to further improve its environmental credentials, EMA teamed up with HSG to install the Ureco system which reduces water consumption, saves money on utility bills and improve the washroom experience for passengers departing and arriving at the airport.

The approach


EMA trialled the Ureco system over an eight-week period and then HSG’s technical team took advantage of lockdown to install the system across the site – maintaining safe social distancing throughout the programme.

The results

The Ureco system will reduce EMA’s water consumption by 16,845,480 litres over the next three years, produce 5.907 less tonnes of CO2 a year and save the company more than £14,000 in water bills every year.

Saeid Nikjooy, EMA’s Head of Asset Maintenance Services, explained: “The results were outstanding both in terms of the washroom hygiene and the reduced water usage and we have rolled out the system across the site with 68 Ureco units and 26 Uretech water managers.

“Sustainability is embedded into all our operations and we aim to lead the way among airports in addressing our social and environmental responsibilities and achieving significant cost savings.

“Furthermore, as travel restrictions are eased and passenger numbers increase, improved washroom facilities will be vitally important for our customers in the terminal building.”

Like it? Share it!

Premier Foods

New Contract Is Icing on the Cake For HSG

Read case study

Blackpool Pleasure Beach

Blackpool Pleasure Beach Still Riding High With Ureco

Read case study

Stena Line

Stena Line has installed HSG’s innovative Ureco washroom water conservation system

Read case study

Birmingham Museum

Birmingham Museums Trust Reduces Water Usage and Environmental Impact

Read case study

Cadent Gas

High Service Standards Delivered for Cadent

Read case study

Celtic Manor Resort

Ureco Savings Soar At Celtic Manor Resort

Read case study

Shire Foods

Ureco improves the washroom experience for growing workforce

Read case study

The NEC

NEC Makes Olympic Savings Thanks to HSG

Read case study

University of Derby

Massive savings, improved washrooms and environmental accreditation makes Ureco a winner

Read case study

Seven Restaurant

Savings and Satisfaction Are Top of the Bill at Seven

Read case study

Pizza Hut

A nationwide solution for Pizza Hut

Read case study

Lancaster University

Water consumption and an improved washroom environment contributes to Green Lancaster credentials.

Read case study

Keep updated with the latest HSG news, offers & innovations

Awards